Plaza Premium Lounge

This project marks a major airport renovation: the largest Plaza Premium Lounge in North America. The 10,600 sq. ft. space is located in the new Pier D International Departures area at Vancouver International Airport (YVR).  

Because the work took place in a live airport environment (both non-airside and airside), uninterrupted operations and stringent safety and security protocols were non-negotiable. The Special Services Group team collaborated with YVR, proactively submitting all required documentation to ensure full compliance and alignment before starting work. Paired with an accelerated fast-track schedule, this meant seven-day workweeks, and, at peak periods, our trade partners and team operated 24 hours a day, under three separate shifts, to meet critical deadlines. 

The new lounge can host up to 200 guests and includes two bars and a fully equipped commercial kitchen. Our team began by carefully removing the old lounge and drilling over 150 cores to reroute utilities. The team reinforced the roof with structural steel to support new HVAC units and made upgrades to the waterproofing and roofing. Inside, we built new steel stud framing for walls and building systems, then added final finishes like custom cabinetry, granite portals, wall and ceiling finishes, and commercial-grade kitchen equipment. Every element was delivered with care to create a high-end, functional space for travellers. 

Throughout the build, we used collaborative construction techniques to coordinate with multiple partners and ownership groups across Vancouver, Denver, California, and Hong Kong. 