Have a question?

Our team is ready to assist. Call us at 1-855-242-6367 or simply fill out the form below and we’ll be in touch.

Thank you! Your message has been received. Someone from our team will be in touch with you soon.

There was a problem with your submission. Please try again later.

Measuring our impact
Culture of Safety
Our case studies
Builders with purpose
Join our newsletter

Our work spans across different industries, and our projects vary in complexity and size. But one thing remains consistent: collaboration.

Interior image of the pool, feature the 4 lane swim pool, waterslide, and the NINJACROSS retractable obstacle course.

Ricochet Oil Corp. Aquatic Centre

The new 27,000 sq. ft. aquatic facility was built using integrated project delivery (IPD) and features an eight-lane swim tank, leisure pool, lazy river, change rooms, administration offices, an upper deck fitness centre, multipurpose rooms, a hot tub, and storage.  

Drayton Valley, Alberta
Image of the completed Bayside Bridge crossing over open water.

Dufferin Operations Centre

The new 10,000 sq. ft. City of Vaughan operations centre features an administration office with work spaces, accessible bathrooms, and a shared kitchen that was built using modular construction. The second structure is a pre-engineered parking facility with an adjacent fuel station. 

Vaughan, Ontario
Drone image of the new Bigstone Cree Nation Highschool, built by the Chandos Edmonton construction team. The image highlights the athletic sprung structure, main school building, and an exterior Teepee.

Bigstone Cree Nation Highschool

The new 77,500 sq. ft. high school in Bigstone Cree Nation, Alberta, incorprates the Sakaw culture into the physical design of the building. It features an interior and exterior Teepee, an industrial kitchen, 14 classrooms, a woodshop, an outdoor classroom, and a gymnasium with a mezzanine running track and change rooms. 

Bigstone Cree Nation, Alberta