Have a question?

Our team is ready to assist. Call us at 1-855-242-6367 or simply fill out the form below and we’ll be in touch. You can also connect with a local office by visiting our contact page.

Thank you!

Your message has been received.

Someone from our team will be in touch with you soon.

There was a problem with your submission. Please try again later.

Lacombe Regional Lift Station

The North Red Deer Regional Wastewater Services Commission is constructing a large diameter trunk line to transport wastewater from the Town of Blackfalds and the City of Lacombe to the City of Red Deer Wastewater Treatment Plant. Construction of lift stations beside the existing wastewater lagoons in south Blackfalds and east Lacombe is required. Chandos' scope of work includes the Lacombe Lift Station which will be a three-storey structure on a 240 m2 building footprint. The building will have a single above-grade floor built over two levels of below-grade structure for pumps and reservoirs. Chandos won this project through a lump sum bid to the Commission through Stantec Consulting Engineers. The pipeline requires a deep excavation and ties in with a cast-in-place sub structure complete with a septage receiving station. The project scope also includes a precast exterior wall system and structural pumps, instrumentation, and yard civil including the draining of an existing lagoon. The area for excavation has a high water table and that is one of the priorities for the project team.

Back to projects