Mill Creek Pool

Nestled in the Mill Creek area of Edmonton, Alberta, the Mill Creek Pool has been serving community members since the mid-1950s.

As new pool walls and floors were required, our team was able to take advantage of the opportunity to also introduce an accessible zero-entry pool floor which makes the pool more accessible and useable for children and wheelchair users.

Inside the aged locker room facility, our team was responsible for the replacement of the failing underground drainage piping.

To address scheduling delays throughout the winter, our team erected hoarding to enable continuous construction. This approach allowed the pool walls and beach entry slope to reach full height, resulting in cost savings compared to the original plan. This also helped the team stay on schedule for the plaster coating installation the following spring.

Client

City of Edmonton

Served From

Edmonton

Project Locations

Edmonton Alberta
Size: 12,000 sq. ft.

Project Consultants

Aqua Plans Aquatic Consulting, MBAC, RJC, Williams Engineering

Trade Partners

Action Electric, Fossil Contracting, Master Pools

Services

Building retrofits, Preconstruction advisory, Self-perform, Strategic services group, Virtual design and construction / BIM