Our team followed a collaborative construction aproach and worked closely with the client and design team to construct this water reservoir.
The specialized nature of the work required the build to be done in phases. The concrete and formwork scopes were a large portion of this project. We also needed to complete excavation of the new reservoir, install piping systems and erosion control; as well as develop flow structures and major cast-in-place concrete works.
We faced a challenging schedule but collaboration helped us deliver the project successfully.